Sweinstein the pig mascot

Plumbing contractors

Plumbing takeoffs, flushed out fast.

Upload the P sheets. Sweinstein counts fixtures and drains, pulls every fixture and equipment schedule, and answers your questions about the plans.

E2.0 — Lighting plan · Takeoff
?

Counts

Type A light6
Type B light3
Duplex outlet24
Exit sign2

1 to review

What it counts

  • Plumbing fixtures by type
  • Floor drains and cleanouts
  • Water heaters and equipment

What it checks

  • Fixture schedule against plan counts
  • Equipment needing electrical hookups
  • Notes and specs across sheets

Ask it

  • "How many WC-1 on the main floor?"
  • "What size is the water heater?"
  • "Any notes about backflow?"
Panel LP — Schedule · E03.2
CircuitBreakerPolesLoad
LP-120A1PLighting — Dining
LP-320A1PReceptacles — Kitchen
LP-530A2PWalk-in cooler
LP-740A2PRTU-1
RTU-1 needs 50A on M1.0 — panel shows 40A
Ask Sweinstein
Do the breakers on the panels match the mechanical schedule?
Sweinstein the pig mascot
11 of 12 match. RTU-1 is listed at 50A on M1.0 but fed by a 40A breaker on Panel LP (E03.2).
M1.0 EquipmentE03.2 Panel LP
Ask about your plans…
Sweinstein the pig mascot

No more drowning in fixture counts. Sweinstein loves a good mud bath, not a backlog.

FAQ

Plumbing questions

Sweinstein the pig mascot

Stop counting. Start bidding.

Upload your plans. Sweinstein has you covered. Start free — 2 takeoffs on us, then 1 every month. No card needed.

Start free