
Plumbing contractors
Plumbing takeoffs, flushed out fast.
Upload the P sheets. Sweinstein counts fixtures and drains, pulls every fixture and equipment schedule, and answers your questions about the plans.
E2.0 — Lighting plan · Takeoff
?
Counts
Type A light6
Type B light3
Duplex outlet24
Exit sign2
1 to review
What it counts
- Plumbing fixtures by type
- Floor drains and cleanouts
- Water heaters and equipment
What it checks
- Fixture schedule against plan counts
- Equipment needing electrical hookups
- Notes and specs across sheets
Ask it
- "How many WC-1 on the main floor?"
- "What size is the water heater?"
- "Any notes about backflow?"
Panel LP — Schedule · E03.2
| Circuit | Breaker | Poles | Load |
|---|---|---|---|
| LP-1 | 20A | 1P | Lighting — Dining |
| LP-3 | 20A | 1P | Receptacles — Kitchen |
| LP-5 | 30A | 2P | Walk-in cooler |
| LP-7 | 40A | 2P | RTU-1 |
RTU-1 needs 50A on M1.0 — panel shows 40A
Ask Sweinstein
Do the breakers on the panels match the mechanical schedule?

11 of 12 match. RTU-1 is listed at 50A on M1.0 but fed by a 40A breaker on Panel LP (E03.2).
M1.0 EquipmentE03.2 Panel LP
Ask about your plans…

No more drowning in fixture counts. Sweinstein loves a good mud bath, not a backlog.
FAQ
Plumbing questions

Stop counting. Start bidding.
Upload your plans. Sweinstein has you covered. Start free — 2 takeoffs on us, then 1 every month. No card needed.
Start free