Fire protection contractors
Fire alarm and sprinkler takeoffs, done in a flash.
Upload the FA and FP sheets. Sweinstein counts every head and device, reads the legends and device schedules, and answers code-note questions from the drawings.
E2.0 — Lighting plan · Takeoff
?
Counts
Type A light6
Type B light3
Duplex outlet24
Exit sign2
1 to review
What it counts
- Sprinkler heads by type
- Pull stations, horn/strobes and speakers
- Smoke and heat detectors
- Control panels and modules
What it checks
- Device legend against plan symbols
- Devices shown on fire alarm sheets but missing elsewhere
- Notes and specs across sheets
Ask it
- "How many horn/strobes on level 2?"
- "What type of sprinkler head is in the kitchen?"
- "Any notes about duct detectors?"
Panel LP — Schedule · E03.2
| Circuit | Breaker | Poles | Load |
|---|---|---|---|
| LP-1 | 20A | 1P | Lighting — Dining |
| LP-3 | 20A | 1P | Receptacles — Kitchen |
| LP-5 | 30A | 2P | Walk-in cooler |
| LP-7 | 40A | 2P | RTU-1 |
RTU-1 needs 50A on M1.0 — panel shows 40A
Ask Sweinstein
Do the breakers on the panels match the mechanical schedule?

11 of 12 match. RTU-1 is listed at 50A on M1.0 but fed by a 40A breaker on Panel LP (E03.2).
M1.0 EquipmentE03.2 Panel LP
Ask about your plans…

Sweinstein is on fire. Figuratively. Please don't test the sprinklers on it.
FAQ
Fire Protection questions

Stop counting. Start bidding.
Upload your plans. Sweinstein has you covered. Start free — 2 takeoffs on us, then 1 every month. No card needed.
Start free