
Estimating services & freelance estimators
More bids out the door, same number of estimators.
Run every client's drawings through Sweinstein. Counts, schedules and cross-checks are ready when you sit down, so you spend your time reviewing instead of clicking.
E2.0 — Lighting plan · Takeoff
?
Counts
Type A light6
Type B light3
Duplex outlet24
Exit sign2
1 to review
What it counts
- Symbols on any trade's plans
- Every schedule, exported to CSV
- Breaker totals from panel schedules
What it checks
- Conflicts between disciplines
- Schedule against plan counts
- Missing specs to raise as RFIs
Ask it
- "Summarize the electrical scope."
- "What's missing from the luminaire schedule?"
- "Which sheets mention alternates?"
Panel LP — Schedule · E03.2
| Circuit | Breaker | Poles | Load |
|---|---|---|---|
| LP-1 | 20A | 1P | Lighting — Dining |
| LP-3 | 20A | 1P | Receptacles — Kitchen |
| LP-5 | 30A | 2P | Walk-in cooler |
| LP-7 | 40A | 2P | RTU-1 |
RTU-1 needs 50A on M1.0 — panel shows 40A
Ask Sweinstein
Do the breakers on the panels match the mechanical schedule?

11 of 12 match. RTU-1 is listed at 50A on M1.0 but fed by a 40A breaker on Panel LP (E03.2).
M1.0 EquipmentE03.2 Panel LP
Ask about your plans…

Bring home more bacon. Sweinstein will pretend not to notice.
FAQ
Estimating Services questions

Stop counting. Start bidding.
Upload your plans. Sweinstein has you covered. Start free — 2 takeoffs on us, then 1 every month. No card needed.
Start free