HVAC takeoffs, without the squint.

Upload the M sheets. Sweinstein reads every equipment schedule, counts diffusers and devices on the plans, and checks that power hookups match the electrical drawings.

E2.0 — Lighting plan · Takeoff
?

Counts

Type A light6
Type B light3
Duplex outlet24
Exit sign2

1 to review

What it counts

  • Diffusers, grilles and registers by type
  • Equipment schedule entries (RTUs, fans, unit heaters)
  • Thermostats, sensors and controls

What it checks

  • Equipment power requirements against panel breakers
  • Schedule tags against plan tags
  • Specs that disagree between sheets

Ask it

  • "List every unit that needs a power hookup."
  • "What's the MCA on RTU-2?"
  • "Which sheets show EF-1?"
Panel LP — Schedule · E03.2
CircuitBreakerPolesLoad
LP-120A1PLighting — Dining
LP-320A1PReceptacles — Kitchen
LP-530A2PWalk-in cooler
LP-740A2PRTU-1
RTU-1 needs 50A on M1.0 — panel shows 40A
Ask Sweinstein
Do the breakers on the panels match the mechanical schedule?
Sweinstein the pig mascot
11 of 12 match. RTU-1 is listed at 50A on M1.0 but fed by a 40A breaker on Panel LP (E03.2).
M1.0 EquipmentE03.2 Panel LP
Ask about your plans…
Sweinstein the pig mascot

Sweinstein keeps its cool so your estimators can too.