
Low-voltage, security & AV integrators
Low-voltage takeoffs, zero static.
Upload the T, S and AV sheets. Sweinstein counts every data drop, camera, card reader and speaker, and pulls the device schedules into clean tables.
E2.0 — Lighting plan · Takeoff
?
Counts
Type A light6
Type B light3
Duplex outlet24
Exit sign2
1 to review
What it counts
- Data and voice outlets
- Cameras, card readers and door hardware
- Speakers, displays and AV devices
- Wireless access points
What it checks
- Device schedule against plan counts
- Devices needing power from the electrical sheets
- Notes and specs across sheets
Ask it
- "How many data drops in the office area?"
- "Which doors have card readers?"
- "What camera model is specified?"
Panel LP — Schedule · E03.2
| Circuit | Breaker | Poles | Load |
|---|---|---|---|
| LP-1 | 20A | 1P | Lighting — Dining |
| LP-3 | 20A | 1P | Receptacles — Kitchen |
| LP-5 | 30A | 2P | Walk-in cooler |
| LP-7 | 40A | 2P | RTU-1 |
RTU-1 needs 50A on M1.0 — panel shows 40A
Ask Sweinstein
Do the breakers on the panels match the mechanical schedule?

11 of 12 match. RTU-1 is listed at 50A on M1.0 but fed by a 40A breaker on Panel LP (E03.2).
M1.0 EquipmentE03.2 Panel LP
Ask about your plans…

Low voltage, high spirits. Sweinstein never gets its wires crossed.
FAQ
Low-Voltage questions

Stop counting. Start bidding.
Upload your plans. Sweinstein has you covered. Start free — 2 takeoffs on us, then 1 every month. No card needed.
Start free