Electrical contractors
Electrical takeoffs, counted by AI.
Upload the E sheets. Sweinstein counts every fixture and device, pulls every panel schedule, and flags breakers that don't match the equipment they feed.
E2.0 — Lighting plan · Takeoff
?
Counts
Type A light6
Type B light3
Duplex outlet24
Exit sign2
1 to review
What it counts
- Light fixtures by type
- Receptacles, switches and devices
- Exit and emergency lights
- Breakers by size and poles from panel schedules
What it checks
- Breaker sizes against equipment and mechanical schedules
- Luminaire schedule against plan counts
- Missing or mismatched specs across sheets
Ask it
- "What feeds RTU-1?"
- "Any specs on the EV charger?"
- "How many type A fixtures on E2.0?"
Panel LP — Schedule · E03.2
| Circuit | Breaker | Poles | Load |
|---|---|---|---|
| LP-1 | 20A | 1P | Lighting — Dining |
| LP-3 | 20A | 1P | Receptacles — Kitchen |
| LP-5 | 30A | 2P | Walk-in cooler |
| LP-7 | 40A | 2P | RTU-1 |
RTU-1 needs 50A on M1.0 — panel shows 40A
Ask Sweinstein
Do the breakers on the panels match the mechanical schedule?

11 of 12 match. RTU-1 is listed at 50A on M1.0 but fed by a 40A breaker on Panel LP (E03.2).
M1.0 EquipmentE03.2 Panel LP
Ask about your plans…

More watts, less work. Sweinstein is positively charged about counting.
FAQ
Electrical questions

Stop counting. Start bidding.
Upload your plans. Sweinstein has you covered. Start free — 2 takeoffs on us, then 1 every month. No card needed.
Start free