
General contractors
The whole set, read before lunch.
Upload every discipline. Sweinstein reads the architectural, structural, mechanical, electrical and plumbing sheets, finds where trades disagree, and answers scope questions in seconds.
E2.0 — Lighting plan · Takeoff
?
Counts
Type A light6
Type B light3
Duplex outlet24
Exit sign2
1 to review
What it counts
- Doors, fixtures and equipment from schedules
- Symbol counts on any discipline
- Schedule entries across every trade
What it checks
- Mechanical equipment against electrical feeds
- Schedules that disagree between disciplines
- Specs and notes that conflict across sheets
Ask it
- "Who is supplying the kitchen hood?"
- "Are there conflicts between M and E?"
- "List all equipment by owner-supplied."
Panel LP — Schedule · E03.2
| Circuit | Breaker | Poles | Load |
|---|---|---|---|
| LP-1 | 20A | 1P | Lighting — Dining |
| LP-3 | 20A | 1P | Receptacles — Kitchen |
| LP-5 | 30A | 2P | Walk-in cooler |
| LP-7 | 40A | 2P | RTU-1 |
RTU-1 needs 50A on M1.0 — panel shows 40A
Ask Sweinstein
Do the breakers on the panels match the mechanical schedule?

11 of 12 match. RTU-1 is listed at 50A on M1.0 but fed by a 40A breaker on Panel LP (E03.2).
M1.0 EquipmentE03.2 Panel LP
Ask about your plans…

Sweinstein herds all your trades. It's basically a sheepdog, but a pig.
FAQ
General Contractors questions

Stop counting. Start bidding.
Upload your plans. Sweinstein has you covered. Start free — 2 takeoffs on us, then 1 every month. No card needed.
Start free