Solar & EV charging installers
Solar and EV takeoffs, fully charged.
Upload the drawings. Sweinstein counts chargers, inverters and equipment, reads their specs, and checks the breakers on the panel schedules that feed them.
E2.0 — Lighting plan · Takeoff
?
Counts
Type A light6
Type B light3
Duplex outlet24
Exit sign2
1 to review
What it counts
- EV chargers by type
- Inverters, disconnects and equipment
- Breakers feeding chargers and inverters
What it checks
- Charger specs against panel breakers
- Equipment schedule against plan counts
- Notes and specs across sheets
Ask it
- "Any specs on the EV charger?"
- "What breaker feeds the inverter?"
- "How many level 2 chargers?"
Panel LP — Schedule · E03.2
| Circuit | Breaker | Poles | Load |
|---|---|---|---|
| LP-1 | 20A | 1P | Lighting — Dining |
| LP-3 | 20A | 1P | Receptacles — Kitchen |
| LP-5 | 30A | 2P | Walk-in cooler |
| LP-7 | 40A | 2P | RTU-1 |
RTU-1 needs 50A on M1.0 — panel shows 40A
Ask Sweinstein
Do the breakers on the panels match the mechanical schedule?

11 of 12 match. RTU-1 is listed at 50A on M1.0 but fed by a 40A breaker on Panel LP (E03.2).
M1.0 EquipmentE03.2 Panel LP
Ask about your plans…

Sweinstein runs on sunshine and curiosity. Mostly curiosity.
FAQ
Solar & EV Charging questions

Stop counting. Start bidding.
Upload your plans. Sweinstein has you covered. Start free — 2 takeoffs on us, then 1 every month. No card needed.
Start free