Sweinstein the pig mascot

Engineers & architects

Catch the mismatch before the contractor does.

Upload your set before you issue. Sweinstein cross-checks schedules, legends and plans across disciplines and shows you where the drawings disagree.

E2.0 — Lighting plan · Takeoff
?

Counts

Type A light6
Type B light3
Duplex outlet24
Exit sign2

1 to review

What it counts

  • Symbols against each sheet's legend
  • Schedule entries by discipline

What it checks

  • Breaker sizes against equipment schedules
  • Fixture types on plans against schedules
  • Notes and specs that conflict between sheets

Ask it

  • "Do the panel breakers match the mechanical schedule?"
  • "Is every luminaire type on the plans scheduled?"
  • "Which sheets mention the generator?"
Panel LP — Schedule · E03.2
CircuitBreakerPolesLoad
LP-120A1PLighting — Dining
LP-320A1PReceptacles — Kitchen
LP-530A2PWalk-in cooler
LP-740A2PRTU-1
RTU-1 needs 50A on M1.0 — panel shows 40A
Ask Sweinstein
Do the breakers on the panels match the mechanical schedule?
Sweinstein the pig mascot
11 of 12 match. RTU-1 is listed at 50A on M1.0 but fed by a 40A breaker on Panel LP (E03.2).
M1.0 EquipmentE03.2 Panel LP
Ask about your plans…
Sweinstein the pig mascot

Fewer RFIs, more pig puns. A fair trade.

FAQ

Engineers & Architects questions

Sweinstein the pig mascot

Stop counting. Start bidding.

Upload your plans. Sweinstein has you covered. Start free — 2 takeoffs on us, then 1 every month. No card needed.

Start free