
Engineers & architects
Catch the mismatch before the contractor does.
Upload your set before you issue. Sweinstein cross-checks schedules, legends and plans across disciplines and shows you where the drawings disagree.
E2.0 — Lighting plan · Takeoff
?
Counts
Type A light6
Type B light3
Duplex outlet24
Exit sign2
1 to review
What it counts
- Symbols against each sheet's legend
- Schedule entries by discipline
What it checks
- Breaker sizes against equipment schedules
- Fixture types on plans against schedules
- Notes and specs that conflict between sheets
Ask it
- "Do the panel breakers match the mechanical schedule?"
- "Is every luminaire type on the plans scheduled?"
- "Which sheets mention the generator?"
Panel LP — Schedule · E03.2
| Circuit | Breaker | Poles | Load |
|---|---|---|---|
| LP-1 | 20A | 1P | Lighting — Dining |
| LP-3 | 20A | 1P | Receptacles — Kitchen |
| LP-5 | 30A | 2P | Walk-in cooler |
| LP-7 | 40A | 2P | RTU-1 |
RTU-1 needs 50A on M1.0 — panel shows 40A
Ask Sweinstein
Do the breakers on the panels match the mechanical schedule?

11 of 12 match. RTU-1 is listed at 50A on M1.0 but fed by a 40A breaker on Panel LP (E03.2).
M1.0 EquipmentE03.2 Panel LP
Ask about your plans…

Fewer RFIs, more pig puns. A fair trade.
FAQ
Engineers & Architects questions

Stop counting. Start bidding.
Upload your plans. Sweinstein has you covered. Start free — 2 takeoffs on us, then 1 every month. No card needed.
Start free