Sweinstein the pig mascot

Lighting reps, distributors & controls

Fixture counts for quotes, before the coffee's done.

Upload the lighting plans. Sweinstein reads the luminaire schedule, counts every fixture type on the plans, and flags types that appear in one but not the other.

E2.0 — Lighting plan · Takeoff
?

Counts

Type A light6
Type B light3
Duplex outlet24
Exit sign2

1 to review

What it counts

  • Every fixture type on the plans
  • Exit and emergency fixtures
  • Sensors and lighting controls

What it checks

  • Luminaire schedule against plan counts
  • Types on plans missing from the schedule
  • Wattage and specs across sheets

Ask it

  • "How many type B fixtures total?"
  • "What's the wattage of type A?"
  • "Which fixtures are on emergency?"
Panel LP — Schedule · E03.2
CircuitBreakerPolesLoad
LP-120A1PLighting — Dining
LP-320A1PReceptacles — Kitchen
LP-530A2PWalk-in cooler
LP-740A2PRTU-1
RTU-1 needs 50A on M1.0 — panel shows 40A
Ask Sweinstein
Do the breakers on the panels match the mechanical schedule?
Sweinstein the pig mascot
11 of 12 match. RTU-1 is listed at 50A on M1.0 but fed by a 40A breaker on Panel LP (E03.2).
M1.0 EquipmentE03.2 Panel LP
Ask about your plans…
Sweinstein the pig mascot

Sweinstein is a bright pig. We had to.

FAQ

Lighting & Controls questions

Sweinstein the pig mascot

Stop counting. Start bidding.

Upload your plans. Sweinstein has you covered. Start free — 2 takeoffs on us, then 1 every month. No card needed.

Start free